montanavorti.blogg.se

Who owns ifactor engineering
Who owns ifactor engineering




who owns ifactor engineering

DOE NETL) CO 2 capture performance and cost target, as indicated in the submitted TEA and summarized in this report. If successful, the proposed heat integrated post-combustion CCS will pave the way to achieve the United States Department of Energy National Energy Technology Laboratory (U.S. Furthermore, the Recipient has proposed a combined modular and freestanding column configuration with an advanced absorber gas/liquid distribution system, an advanced solvent, with the integration of discrete packing, a smart cross-over heat exchanger, and a load and ambient condition following control strategy, all to address ten of 12 technology gaps identified during the Phase I work. Specifically during Phase 1, the Recipient has provided all necessary documentation to support its Phase 2 down-selection including: the Project Narrative, the updated Project Management Plan (PMP), the preliminary engineering design, the Technical and Economic Analysis report (TEA) (including the Case 12 – Major Equipment List and submitted as a Topical Report), a Phase 1 Technology Gap Analysis (TGA), an Environmental Health and Safety (EH&S) Assessment on the 10 MWe unit, and updated Phase 2 cost estimates (including the detailed design, procurement, construction, operation, and decommissioning costs) with a budget justification.

who owns ifactor engineering

The proposed project (Phase 1 and 2) will involve the design, fabrication, installation and testing of a large more » pilot scale facility that will demonstrate the UKy-CAER innovative carbon capture system integrated with an operating supercritical power plant.

who owns ifactor engineering

In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UKy-CAER) (Recipient) has developed an advanced, versatile, 10 MWe post-combustion CO 2 capture system (CCS) for a coal-fired power plant, Louisville Gas and Electric Company’s Trimble County Generating Station, using a heat integrated process combined with two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance. The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0026497.






Who owns ifactor engineering